ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Construction Of , Ratnagiri - Tender Details
Explore tender information for Corrigendum Construction Of in Ratnagiri, including eligibility, deadlines, and bid specifics.
Maharashtra Airport Development Company Limited
Ratnagiri, Maharashtra, India
NTID 38737953
- Opening Date : Mon 27th January, 2025
- Closing Date : Fri 24th January, 2025
- ₹ 268900000.00
- NTID 38737953
Corrigendum : Construction Of Apron, Link Taxiway Agl Road Works And Storm Water Drainage At Ratnagiri Airport
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2689000.00 -
Document Cost
11800.00 -
Estimated Cost
268900000.00
BOQ Items Total Items : 5 | Total Qty : 4
# | Item | Quantity | Units |
---|---|---|---|
1 | Engineering, Procurement, Construction of Apron, Link Taxiway, AGL, Road works and Storm Water Drainage including site preparation works, 2 years Defect Liability Period at Ratnagiri Airport as per Master plan, Specifications, Codes & Practices contained in the Tender Document. The design of facilities shall confirm to standard specified by FAA, ICAO, DGCA, AAI, MORTH, IRC, NBC, CPWD, IS etc. wherever required and in conformity with ATM / CNS / IMD / BCAS regulations regarding permissible heights, locations requirements etc. i/c all other works covered under Scope of work and meeting all relevant statutory requirements complete as required. Construction of the Project/Work on the Site set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D and Special Conditions of Contract, if any. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement General Requirements Cost of Preliminaries, Mobilization, Site Management including Provisions of Work Programme under the Contract, Safety & Environmental Management, Statutory Requirements, Insurances & Bank Guarantees, Temporary Site Office & Labour Camp/ Facilities, Provision of Drawings/ Testing & Commissioning Procedures/ O & M Manuals/ Quality Assurance Plan etc all as per the contract including establishment and removal of all temporary facilities as per the requirements of MADC and Statutory Agencies standards | ||
2 | Construction of Apron, Link Taxiway (Rigid Pavement) and AGL works | 1.000 | Nos |
3 | Construction of Road Works - Internal roads and Paved surface for Car parking area,PTB, Utility building area, GSE and STP area (Flexible Pavement) | 1.000 | Nos |
4 | Storm water drainage work of Airside and Internal roads | 1.000 | Nos |
5 | Construction of Approach Road (Flexible pavement) and its associated storm water drainage work | 1.000 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054