- Home
- >
- Tender
- >
- Lakshadweep Tender
- >
- Department of ANDAMAN LAKSHADWEEP HARBOUR WORKS
- >
NTID 39600711
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Corrigendum Attending Repair, Lakshadweep - Tender Details
ANDAMAN LAKSHADWEEP HARBOUR WORKS
Lakshadweep, Lakshadweep, India
NTID 39600711
- Opening Date : Tue 1st April, 2025
- Closing Date : Mon 31st March, 2025
- ₹ 9154865.00
- NTID 39600711
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
183100.00 -
Document Cost
Refer Documents -
Estimated Cost
9154865.00
BOQ Items Total Items : 18 | Total Qty : 1215.08
# | Item | Quantity | Units |
---|---|---|---|
1 | Timber repair work including dismantling and removing the defective portion of Tug above and below water level of boat sides, deck, hull fender, wheel house, engine room including top area, crew cabin, partition wall, providing additional cross beams repairing / removing hull holding beams, rib beams, auxiliary beams, hull main beams, ribs etc, wherever found necessary as per standard marine practice & IS specifications and as per the direction of the Engineer-In-Charge where ever found necessary including cost of all labour charges, minor tools, cost of all materials, all statutory taxes, including timber seasoned for marine works, etc., complete. | 21.08 | Cum |
2 | Removing the old putty, caulking etc, cleaning all the timber joints, above water level, hull, deck, wheel house engine room top etc, as per requirement and where ever found necessary, doing fresh caulking, applying marine glue, all works as per standard practice wherever found necessary and as directed by the Engineer-In-Charge including cost of all labour charges, minor tools & plants sundries, but including cost of all materials required for the work, all labour charges minor tools, all statutory taxes etc., complete. | 1,180.00 | Rmt |
3 | Preparing the hull portion planks for applying fibre compound and applying of fibre compound on the entire hull portion, engine room top, wheel house sides/ top and wherever found necessary and as instructed by Engineer-In-Charge, including cost of all labour charges, cost of minor tools and all materials required for the work, like fibre compound, fibre oil, all statutory taxes, etc., complete. | 218.00 | Sqm |
4 | Fixing of Marine plywood,12 mm thick for board work for covering of wheel house canopy of the craft, covering, shelf and cupboard etc wherever required as directed by Engineer-In-Charge, including cost of all labour charges, minor tools etc, and including cost of marine plywood, brass screw, all statutory taxes, etc., complete. | 92.00 | Sqm |
5 | Dismantling 'Bracket & cut less bushes, wooden bushes, stern tube, propeller shaft, stuffing box etc. replacing the cut less bushes, wooden bushes, checking the alignment of propeller shaft, propeller, repairing/ replacing the shaft and propeller if required for coupling with new engine gear box, manufacturing the couplings, stern tube etc, refixing all the accessories/new accessories with ssbolt/copper bolt, all in line and alignment, coupling the propeller shaft and intermediate shaft with gear box, checking the alignment, etc. including cost of all labour charges, lathe charges, cost of tools & plants, transportation charges of all materials to work site, cost of cut less bush, wooden bush, bolt & nut , propeller, propeller shaft, Intermediate shaft and couplings, all statutory taxes etc., complete. | 2.00 | set |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054