ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Consultancy Work For Obtaining, Khurda - Tender Details
Explore tender information for Consultancy Work For Obtaining in Khurda, including eligibility, deadlines, and bid specifics.
National Institute of Science Education and Research
Khurda, Odisha, India
NTID 39436682
Opening Date : Fri 28th February, 2025
Closing Date : Thu 27th February, 2025
- ₹ 224200.00
- NTID 39436682
Consultancy Work For Obtaining Various Clearances From Statutory Authorities Fire Authorities Bda As Applicable For The Establishment Of Nabl Accredited Calibration Laboratory Building At Niser Jatni 752050
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
12000.00 -
Document Cost
Refer Documents -
Estimated Cost
224200.00
BOQ Items Total Items : 2 | Total Qty : 1
# | Item | Quantity | Units |
---|---|---|---|
1 | Obtaining various Clearances from concerned statutory authorities / BDA for the present scope of the Project, including obtaining all prerequisite statutory clearances from start to end. (i.e. from obtaining plan approvals and commencement certificate up to Obtaining Occupancy Certificate, including all intermittent supporting clearances, if any) for the NABL Accreditated Calibration Laboratory building (G+1 ) in the existing NSER campus, as per requirement and instruction of the Engineer-in-Charge (for the built-up area of 600.00 sq.m approx.). a) Getting structural drawings, design, and analysis vetted by IIT or Govt. Institution as approved by the Statutory authority, including submission of drawings/any other details required by the statutory authority. b) Periodic follow-up with statutory authority, including preparation and presentation to the building committee c) Getting all the approval and certificates from the Statutory authority from commencement to occupancy. | 1 | Job |
2 | The scope of work include : Stage 1: Obtaining all the required statutory clearances to start the construction work, up to obtaining of Commencement Certificate (CC). Stage 2: Obtaining all the statutory clearances required for the completion certificate and Occupation Certificate (OC) and submission for OC, including intermittent clearances, if any, required during the execution of work. Stage 3 : Obtaining of Completion Certificate and Occupation Certificate Payment schedule shall be as follows : After completion of stage 1 : 50% After completion of stage 2 : 20% After completion of stage 3 : 30% Notes:- 1) The work shall be carried out and necessary clearances obtained, strictly in accordance with requirements and other notifications published by the Statutory authorities from time to time. 2) The cost should be inclusive of GST. 3) Cost should not be changed for variation up to (+)10% of the built-up area. Charges beyond this shall be paid on Pro-Rata Basis. |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054