ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Constuction Of Bhogshala And D, DEHRADUN - Tender Details
Explore tender information for Constuction Of Bhogshala And D in DEHRADUN, including eligibility, deadlines, and bid specifics.
Bridge Ropeway Tunnel And Other Infrastructure Development Corporation of Uttarakhand Limited
DEHRADUN, Uttarakhand, India
NTID 39435127
Opening Date : Wed 12th March, 2025
Closing Date : Wed 12th March, 2025
- ₹ 54976000.00
- NTID 39435127
Constuction Of Bhogshala And Dharmshala At Pawasi Mahasu Devta Thadiyar Distt Dehradun (civil Work)
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1100000.00 -
Document Cost
5900.00 -
Estimated Cost
54976000.00
BOQ Items Total Items : 140 | Total Qty : 14977.47
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 1,320.95 | Cum |
2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 1 0 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. Ordinary rock | 330.24 | Cum |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 1,155.84 | Cum |
4 | Extra for every additional lift of 1 . 5 m or part thereof in excavation I banking excavated or stacked materials. All kinds of soil | 238.20 | Cum |
5 | Extra for every additional lift of 1 . 5 m or part thereof in excavation I banking excavated or stacked materials. Ordinary or hard rock | 59.55 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054