Inquiry NowConstruction Work Of 8x6 M Rcc, Chitrakoot - Tender Details
Explore tender information for Construction Work Of 8x6 M Rcc in Chitrakoot, including eligibility, deadlines, and bid specifics.
Public Works Department
Chitrakoot, Uttar Pradesh, India
NTID 38916088
- Opening Date : Fri 17th January, 2025
- Closing Date : Fri 17th January, 2025
- ₹ 26900000.00
- NTID 38916088
Construction Work Of 8x6 M Rcc Culvert At Kaushiki Nala In Km 03 Of Mawai Kala Link Road
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1545000.00 -
Document Cost
2720.00 -
Estimated Cost
26900000.00
BOQ Items Total Items : 29 | Total Qty : 11740.62
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismentling Brick work or stone work in line or cement mortar and including stacking of material as directed by the engineer-in-charge within a distance of 60 meters. ( SOR Chapt 2 Pg no 79 Itom 2.7 B) | 257.13 | Cum |
2 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. | 2845.28 | Cum |
3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work | 181.55 | Cum |
4 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 6:3:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. S.I. No. 280 | 162.88 | Cum |
5 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. SI No 305)( SOR Itom No 307pg no 27 Spection no 6.1.3) | 454.84 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054