- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Varanasi Development Authority
- >
NTID 39735257
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Work Of Toilets , Varanasi - Tender Details
Varanasi Development Authority
Varanasi, Uttar Pradesh, India
NTID 39735257
- Opening Date : Wed 2nd April, 2025
- Closing Date : Tue 1st April, 2025
- ₹ 3590000.00
- NTID 39735257
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
72000.00 -
Document Cost
3110.00 -
Estimated Cost
3590000.00
BOQ Items Total Items : 273 | Total Qty : 6515.158
# | Item | Quantity | Units |
---|---|---|---|
1 | Ahirana Gali- Toilet, Septic Tank, Changing Room and Boring Work. | ||
2 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m from the foundation trenches including all T&P phowarah and basket etc. complete. [PWD SOR 2020 -251) | 17.000 | Cum |
3 | Earth workin cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding 1/2 meter (20'') in depth and earth work in enbankment to be in 20cm (8'') layers , including ramming and dressing the surface to requied levels and slopes and also including 1.5m (5') lift and 30m (100') lead.the earth from cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the E/I and cartage of 8km. including loading and unloading. [SOR 2020, SI No. 253+231(a)] | 18.000 | Cum |
4 | Concrete with 4 cm.gauge stone ballast, coarse sand and cement in the proportion of 8:4:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. [SOR 2020, SI No. 281] | 3.000 | Cum |
5 | Cement Concrete with 2 cm. gauge apporved stone ballast, apporve coarse sand and cemnet in the proportion of 4:2:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. [SOR 2020, SI No. 279(b)] | 1.100 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054