ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Water Body At , Rourkela - Tender Details
Explore tender information for Construction Of Water Body At in Rourkela, including eligibility, deadlines, and bid specifics.
Environment Climate Change Department
Rourkela, Odisha, India
NTID 39373087
Opening Date : Tue 25th February, 2025
Closing Date : Mon 24th February, 2025
- ₹ 609169.00
- NTID 39373087
Construction Of Water Body At Near Village Mundajore Forest Block North Chirobeda Beat Barkani Section Bondamunda Forest Range Panposh Of Rourkela Forest Division, District Sundargarh.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 10 | Total Qty : 9441.681
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC. | 3224.000 | Sqm |
2 | Excavation in all kinds of soil including moorum, stoney earth, gravel etc.excepting all kinds of rock & boulders exceeding 0.014Cum in volume for dam base stripping, cut-off trenches, outfall drains and stripping in borrow areas including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 1.5m initial lift including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC. | 144.000 | Cum |
3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter spread with boulders up to 1/2 Cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineering- charge including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete within an initial lead of 1km from the place of excavation complete. | 2873.250 | Cum |
4 | Ramming or rolling eath work with light H.R.R. in embankment in layers not exceeding 0.3m including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC. | 1980.000 | Cum |
5 | Fine dressing and turfing with initial lead of 50 m & Extra lead of 100 m and 1.5 m initial lift & Extra lift of 4.5 m including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC. | 891.330 | Sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054