- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of HIMACHAL PRADESH AGRICULTURE DEVELOPMENT SOCIETY
- >
NTID 39791576
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Tube Well Sche, Palampur - Tender Details
HIMACHAL PRADESH AGRICULTURE DEVELOPMENT SOCIETY
Palampur, Himachal Pradesh, India
NTID 39791576
- Opening Date : Wed 2nd April, 2025
- Closing Date : Tue 1st April, 2025
- ₹ 6165380.00
- NTID 39791576
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
94154.00 -
Document Cost
2000.00 -
Estimated Cost
6165380.00
BOQ Items Total Items : 85 | Total Qty : 18585.28
# | Item | Quantity | Units |
---|---|---|---|
1 | Demplishing cement concrete manually/ by mechanically means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 1.50 | Cum |
2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 114.17 | Cum |
3 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 mtr, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposite layers by ramming, watering, etc and disposing of surplus excavated soil as directed within the lead of 50 mtr, complete in all respect and to the entire satisfaction of engineer-in-charge. | 4992.00 | Rmt |
4 | Extra allowance for formwork in concrete lining | ||
5 | In bed within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 0.75 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054