ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Toilet And Ear, Kheri - Tender Details
Explore tender information for Construction Of Toilet And Ear in Kheri, including eligibility, deadlines, and bid specifics.
Cane Development and Sugar Industry UP
Kheri, Uttar Pradesh, India
NTID 38975431
- Opening Date : Thu 23rd January, 2025
- Closing Date : Wed 22nd January, 2025
- ₹ 337000.00
- NTID 38975431
Construction Of Toilet And Earth Filling Work In Baibahamunnu Singh Khad Godown Campus Samiti Gola
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 53 | Total Qty : 1233.86
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer - Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 2.38 | CUM |
2 | Filling of carted earth.Excavating, supplying and filling of local earth (excluding royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 678.24 | CUM |
3 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 0.88 | CUM |
4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 0.27 | CUM |
5 | R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than (M-20) For Lintel | 0.26 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054