- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Kerala Industrial Infrastructure Development Corporation
- >
NTID 39736268
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Storm Water Dr, Thiruvananthapuram - Tender Details
Kerala Industrial Infrastructure Development Corporation
Thiruvananthapuram, Kerala, India
NTID 39736268
- Opening Date : Sat 5th April, 2025
- Closing Date : Thu 3rd April, 2025
- ₹ 6746568.00
- NTID 39736268
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
2950.00 -
Estimated Cost
6746568.00
BOQ Items Total Items : 24 | Total Qty : 14070.003
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of Storm water drainage works | ||
2 | 2.32 Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1000.0000 | sqm |
3 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 50.0000 | cum |
4 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1362.0000 | cum |
5 | od187534/2024_2025 Earth work excavation for foundation in in all classes of soil other than rock including<br>under water excavation where ever required ,conveying and dumping the excavated soil or liquid mud in<br>convenient places with all leads and lifts including filling the lower portions / undulations if necessary<br>including charges for bailing out water using required capacity pumps if found required and levelling the<br>earth to correct profile, breaking clods , watering ramming etc. complete.<br> | 554.0000 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054