Construction Of Storm Water Dr, Guwahati - Tender Details
Explore tender information for Construction Of Storm Water Dr in Guwahati, including eligibility, deadlines, and bid specifics.
Public Works Roads Department
Guwahati, Assam, India
NTID 39435153
Opening Date : Fri 28th February, 2025
Closing Date : Fri 28th February, 2025
- ₹ 71034000.00
- NTID 39435153
Construction Of Storm Water Drain With Rcc Cover Slab At Pandu Port From Ananda Nagar To River Brahmaputra Under Sopd-g For The Year 2024-25.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1420700.00 -
Document Cost
14207.00 -
Estimated Cost
71034000.00
BOQ Items Total Items : 11 | Total Qty : 43429.518
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (c)Reinforced Cement Concrete | 28.128 | Cum |
2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (b) Rubble Stone Masonry in Cement Mortar | 3487.500 | Cum |
3 | Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.) | 15395.651 | Cum |
4 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (V) Marshy soil (A)-(ii) With dewatering | 11880.000 | Cum |
5 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 | 1701.000 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054