Tender for Jammu and Kashmir State Sports Council - NTID 29828332
Jammu and Kashmir State Sports Council
Srinagar, Jammu and Kashmir, India
NTID 29828332
- Opening Date : Sat 3rd December, 2022
- Closing Date : Fri 2nd December, 2022
- ₹ 45976000.00
- NTID 29828332
Construction Of Sports Bhawan/ Auditorium At Gindun Rajbagh
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
919520.00 -
Document Cost
5500.00 -
Estimated Cost
45976000.00
BOQ Items Total Items : 101 | Total Qty : 163017.68
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth beyond Muncipility limits at the risk, cost and responsibility of the contractor. | 444.32 | CUM |
2 | Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified grade concrete mix, diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embeded in the pile cap etc all complete. By percussion drilling using direct mud circulation (DMC) or Bailer or Chisel technique by tripod and mechanical Winch machine all complete 600 mm dia piles (Length of pile for payment Shall be measured from top of shoe to the bottom of pile cap) (Excavated earth be disposed of beyond Muncipal limits by the contractor on his own risk, cost and responsibilty nothing extra shall be paid on this account. During disposal of muddy earth proper arrangements should be adopted by the contractor so that roads through which vehicles ply shall remain clean). | 1560.00 | Rmt |
3 | Excavating, supplying and filling of local earth (royalty and taxes all complete) by mechanical transport from sorce to site of work including ramming and watering of earth in layers all complete | 608.13 | Cum |
4 | Supply and laying of GSB (Granular Sub Base Course ) incl. spreading, levelling and consolidation with PRR of 8-10 Tonne capacity upto required gradient camber incl. all carriage complete job. | 152.03 | Cum |
5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level . 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size ) | 46.10 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane