Description
Construction Of Silk Route Guest House,leh ( By Way Of Central Heating/pump House/water Storage Tank)
Tendering Authority: The Administration of Union Territory of Ladakh
India, Jammu and Kashmir, LEH
NTID
30494438
Last Date For Submission
07 Feb, 2023
Closing Date
07 Feb, 2023
BOQ Items Total Items : 68 | Total Qty : 5487.360000000001
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches fo rfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | 16.51 | cum |
2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 2.92 | Cum |
3 | Providing and fixing up to floor five level precast cement concrete solid blocks including hoisting and seating in position with cement mortar 1:3 (1: cement 3: coarse sand), cost of centering, Shuttering and complete. Crushed 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20mmm nominal size) | 17.21 | Cum |
4 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) | 8.91 | Cum |
5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 ,landings, balconies, shelves, chajjas , lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring,shuttering, finishing and reinforcement with 1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size | 0.48 | Cum |
Download Documents
NTID: 30494438
