ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Shamshan Ghat , Gautam Budnagar - Tender Details
Explore tender information for Construction Of Shamshan Ghat in Gautam Budnagar, including eligibility, deadlines, and bid specifics.
Yamuna Expressway Industrial Development Authority
Gautam Budnagar, Uttar Pradesh, India
NTID 38927307
- Opening Date : Mon 27th January, 2025
- Closing Date : Thu 23rd January, 2025
- ₹ 2715165.00
- NTID 38927307
Construction Of Shamshan Ghat In Village Tirthali Kheda ,yea Wc-6
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
54500.00 -
Document Cost
865.00 -
Estimated Cost
2715165.00
BOQ Items Total Items : 21 | Total Qty : 13189.7
# | Item | Quantity | Units |
---|---|---|---|
1 | Pumping out water by Diesel pump of discharge capacity of 4000 Its per hour including fuel operator suction & delivery pipes of size 4" X4 " - length 150 mtr as per direction of Engineer in Charge | 73.0000 | Days |
2 | Desilting of ponds under liqid mud and disposal of surplus excavated soil as directed within a lead of 50 m. as per direction by E/l as per site | 1440.0000 | Cum |
3 | Earth work in excavation in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom. Lifts upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | 20.4900 | Cum |
4 | Supply of Good Earth work , banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per (A.R. ) For all kind of soil | 4740.0000 | Cum |
5 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 15.0700 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054