ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Sewak Quarter , Ranchi - Tender Details
Explore tender information for Construction Of Sewak Quarter in Ranchi, including eligibility, deadlines, and bid specifics.
Jharkhand Police Housing Corporation Limited
Ranchi, Jharkhand, India
NTID 39030061
- Opening Date : Tue 28th January, 2025
- Closing Date : Mon 27th January, 2025
- ₹ 121376317.00
- NTID 39030061
Construction Of Sewak Quarter G Plus 6 At Ranchi Police Line In The District Of Ranchi
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1214000.00 -
Document Cost
10000.00 -
Estimated Cost
121376317.00
BOQ Items Total Items : 483 | Total Qty : 199367.264372
# | Item | Quantity | Units |
---|---|---|---|
1 | Section I Building Work | ||
2 | Earth work in excavation in foundation trenches in ordinary soil(vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 728.560 | CUM |
3 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge Hard rock (blasting prohibited) | 728.560 | CUM |
4 | Filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 1566.861 | CUM |
5 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 193.570 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054