Construction Of Sewage Treatme, SAONER - Tender Details
Western Coalfields Limited
SAONER, Maharashtra, India
NTID 39822229
- Opening Date : Fri 18th April, 2025
- Closing Date : Wed 16th April, 2025
- ₹ 8366306.00
- NTID 39822229
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
104600.00 -
Document Cost
Refer Documents -
Estimated Cost
8366306.00
BOQ Items Total Items : 11 | Total Qty : 10
# | Item | Quantity | Units |
---|---|---|---|
1 | Surveying, planning ,Designing & Geotechnical investigation, if required, submission and approval of General Arrangements drawings (GAD), Detailed system design, hydraulic design, mechanical, electrical and civil construction drawings of 290KLD STP based on MBBR Technology as per scope of work and terms and conditions of tender documents including submission and approval of Layout drawing for pumps and electrical items for approval. | 1.000 | LUMP SUM |
2 | CIVIL WORKS : Supply/Construction, installation, testing, commissioning and trial run of all required tanks, chambers, pump house, shed for blower, MGF and ACF including excavation, refilling, levelling of site of STP area and allied works as per instruction of engineer In charge and as per terms and conditions of tender document., including Development works like fencing of boundary of STP, paver, horticulture and landscaping etc. Payment shall be on pro-rata basis as per Payment-Schedule, on progress of work completed duly measured and certified by the Engineer-In-charge. Note :The item of work also includes any other Item of work which is not specified but required for successful completion and commissioning of STP as per scope of work. | 1.000 | LUMP SUM |
3 | MECHANICAL WORKS : Supply, installation, testing , commissioning and trial run of all required Mechanical works / equipments such as pumps, valves, motors, blowers, pipeline/interconnecting pipeline, and other allied works which also include foundation works confirming to stipulated specification and quality in good condition at site as per approved drawing and tender document after inspection and subsequently certified by Engineer-In-Charge. Payment shall be on pro-rata basis as per Payment-Schedule, on progress of work completed duly measured and certified by the Engineer-In-charge. Note :The item of work also includes any other Item of work which is not specified but required for successful completion and commissioning of STP as per scope of work. | 1.000 | LUMP SUM |
4 | ELECTRICAL WORKS : Supply, installation, testing, commissioning and trial run of required Electrical Works/ equipments such as electric control panels and external and internal electrification of pump house, drawing input power connection, Power cables, wiring and allied works which also include foundation/ support works confirming to stipulated specification and quality in good condition at site as per approved drawing and tender document after inspection and subsequently certified by Engineer-In-Charge. Payment shall be on pro-rata basis as per Payment-Schedule, on progress of work completed duly measured and certified by the Engineer-In-charge. Note :The item of work also includes any other Item of work which is not specified but required for successful completion and commissioning of STP as per scope of work. | 1.000 | LUMP SUM |
5 | Operation and maintenance cost of STP for 60 calendar months (i.e. 3x365+2x366) =1827 days) during Defect Liability Period. No extra payment shall made towards repair, replacement of spare parts, components, equipment, and any consumables as per terms and condition of Section-5(B)/ clause No. 33 of GTC of chapter II of CMM and further amended vide letter no.CIL/CIVIL/192/232 dated 07.04.2017. Payment shall be made as per Payment-Schedule , on progress of work completed duly measured and certified by the Engineer-In-charge. Bidder shall quote operation cost for each year seperately as below: |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054