- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Department of Rural Development
- >
NTID 39822510
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Road From Kumu, Sunabeda - Tender Details
- Opening Date : Fri 4th April, 2025
- Closing Date : Thu 3rd April, 2025
- ₹ 16093000.00
- NTID 39822510
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
161000.00 -
Document Cost
10000.00 -
Estimated Cost
16093000.00
BOQ Items Total Items : 102 | Total Qty : 39588.714
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling, &trees girth upto 300 mm , removal of stumps of trees cut eralier & disposal of unserviceable material to be used or auctioned upto a lead of 1000 mtr including removal & disposal of top organic soil not exceeding 150 mm thickness as per direction of Engineer in charge | 6000.000 | Sqm |
2 | Construction of embankment with approved materials obtained from borrow pits transporting to site with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 and as per the direction of the Engineer-in-Charge. | 6087.950 | Cum |
3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 414.140 | cum |
4 | Fine dressing and turfing to the slope of the road embankment with compaction dub grass transported by mechanical means as per the directed by the Engineer in charge. | 5304.000 | Sqm |
5 | Construction of Granular Sub Base Grading III material as per table 400-1 spreading in uniform layers with moto grader on prepared surface, mixing by mix in place method with rotavator at OMC & compacting with vibrator roller to achieve the desired density complete as per clause 401 of Mo SRT&H specifications for Road & Bridge works ( 4th revision) | 1302.950 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054