Inquiry NowConstruction Of Road From Bind, PAKUR - Tender Details
Explore tender information for Construction Of Road From Bind in PAKUR, including eligibility, deadlines, and bid specifics.
RURAL WORKS DEPARTMENT
PAKUR, Jharkhand, India
NTID 38907649
- Opening Date : Mon 20th January, 2025
- Closing Date : Sat 18th January, 2025
- ₹ 27515982.00
- NTID 38907649
Construction Of Road From Bindadih Reo Road To Piparjori Reo Road Via Sampur (l- 2.990 Km)
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
551000.00 -
Document Cost
10000.00 -
Estimated Cost
27515982.00
BOQ Items Total Items : 42 | Total Qty : 50382468.71
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201. | 1.36 | Ha |
2 | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Manual means with In area of light jungle | 1.36 | Ha |
3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20 | 18.00 | M3 |
4 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately. as per Technical Specification Clause 202. | 39.10 | M3 |
5 | Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) | 3774.74 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054