Tender for Public Works Department - NTID 29964723
Public Works Department
Barabanki, Uttar Pradesh, India
NTID 29964723
- Opening Date : Sat 3rd December, 2022
- Closing Date : Sat 3rd December, 2022
- ₹ 2855000.00
- NTID 29964723
Construction Of Retaining Wall At Kotwadham Road (odr) In Km. 2(025)
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
285000.00 -
Document Cost
854.00 -
Estimated Cost
2855000.00
BOQ Items Total Items : 5 | Total Qty : 1146
# | Item | Quantity | Units |
---|---|---|---|
1 | Excavation in foundation in ordinary soil )loam Clay, or Sand) including filling lift upto 1.5 metre (5fts) and lead upto 30 m. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of suplus earth as directed by the Engineer-in-charge upto a distance of 30 (100 fits.) from the foundation trenches . as per SOR-251 | 170.00 | cum |
2 | Construction of sub grade & earthen shoulders approved material obtained from borrow pits with all lift upto 1000 mt. and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300.2 (by carted earth) | 630.00 | cum |
3 | Providing and laying in cement concrete 1:4:8 of stone ballast (40 mm nominal size) 4 approved coarse sand, 1 cement and curing complete including supply of all materials Labour and T&P etc. requried for proper completion work and curring complete and also including cost of formwork in foundation and floors. as per SOR 281 | 11.00 | cum |
4 | Provding and laying in RCC 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 stone aggregate) including supply of all material. labour and T&P etc complete. required for proper completion of work & curing complete also including cost of form works in foundation and floors. all material. labour and T&P etc complete. required for proper completion of work. (For Footing & Column work) M-20 as per SOR-284B | 155.00 | cum |
5 | Mild steel or iron in plain work such as reinforced concrete or reinforce brick wirk (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level as per SOR-504 | 180.00 | Qtl |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane