Inquiry Now3- Construction Of Rest Cycle , Kheri - Tender Details
Explore tender information for 3- Construction Of Rest Cycle in Kheri, including eligibility, deadlines, and bid specifics.
Cane Development and Sugar Industry UP
Kheri, Uttar Pradesh, India
NTID 38975434
- Opening Date : Thu 23rd January, 2025
- Closing Date : Wed 22nd January, 2025
- ₹ 579000.00
- NTID 38975434
3- Construction Of Rest Cycle Stand And Concertina Coil Fencing In Gola Samiti Gola Campus
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 14 | Total Qty : 2707.22
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious materials and disposal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material | 0.36 | Cum |
2 | Conc with 4 Cm gauge Stone ballast Coarse sand of 2.20 FM and cement in proportion of (1:4:8) in foundation and under floors including supply of all material etc all Complete . | 4.57 | Cum |
3 | R.C.C works with cement approved coarse sand F.M (2.2 to 3.6) and 20mm guage approved stone grit in the proportion of 1:2:4( 1cement: 1.5 approved coarse sand : 3 graded stone aggregate 20mm) in Raft Foundation & Footing excluding supply of reinforcement and its bending the same with 24 BWGGI Binding wire and including necessary centering and shuttering etc. and also including supply of all materisls, labour and T&P and curing etc required for proper completion of the work.Stength of the concrete shall not be less than M-20 | 0.54 | Cum |
4 | R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. Binding wire cost being included in the item. | 0.83 | Cum |
5 | M.S. item work such as R.C.C. Completion of work as per DSR | 97.50 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054