ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Rcc Pad In Cmm, Kaiga - Tender Details
Explore tender information for Construction Of Rcc Pad In Cmm in Kaiga, including eligibility, deadlines, and bid specifics.
Nuclear Power Corporation Of India Limited
Kaiga, Karnataka, India
NTID 38890195
- Opening Date : Sat 1st February, 2025
- Closing Date : Thu 30th January, 2025
- ₹ 5789790.00
- NTID 38890195
Construction Of Rcc Pad In Cmm Store Area At Plant Site, Kaiga.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
115796.00 -
Document Cost
Refer Documents -
Estimated Cost
5789790.00
BOQ Items Total Items : 7 | Total Qty : 17863
# | Item | Quantity | Units |
---|---|---|---|
1 | Preparation of surface by Scarifying of existing Bitumen/WBM/Soft rock surface up to an average depth of 300 mm for formation of sub-base by using mechanical equipment [such as JCB], to the required line, level, camber & gradient and consolidation of the base by using Power Road Roller of 8 to 10 tonne capacity, including watering properly to get proper consolidation, collecting & disposing the generated / scarified material or waste, up to a lead of 2000 meters from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations & lifts. | 1719 | SqM |
2 | Providing and laying 230 mm thick Stone Soling below floor & foundations bed etc. using hard, durable & approved quality stones, rubbles, filling interstices using small size stones, stone chips, murum & watering [to fill uip all gaps] etc. including preparation of base properly, levelling, dressing & hand ramming, providing; fixing & removing necessary staging / platform / ladder, collecting & disposing the generated waste, costruction waste up to a lead of 2000 meters from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift / height. | 381 | CuM |
3 | Providing, placing and removing formwork for all In-Situ Concrete Works such as foundation, raft, columns, beams, slab, footings, all other miscellaneous RCC works including providing; fixing & removing necessary staging / platform / ladder, preparation of base, collecting & disposing the generated waste, costruction waste up to a lead of 2000 meters from the place of work & cleaning the work area, etc. complete all as per standard technical specification, drawing [if any] and as directed by engineer-in-charge at all locations and at all lift / height. Note: The measurement for the form work will be actual area of form in contact with the concrete surfaces. | 53 | SqM |
4 | Providing and laying of 90-100 micron thick, polythene sheet [of superior 1st quality, of standard make & confirming relevent BIS specification] as a separation layer above WBM / RCC / PCC with an overlap [both direction] of 150 mm [minimum] including preparation of base, laying the sheet without any folds / wrinkles, providing; fixing & removing necessary staging / platform / ladder [if required], preparation of base, collecting & disposing the generated waste, up to a lead of 2000 meters from the place of work & cleaning the work area, etc. complete all as per standard & manufacturers technical specification, drawing [if any] and as directed by engineer-in-charge at all locations & lifts. | 1651 | SqM |
5 | Providing and laying approved make high yield strength deformed Reinforcement bars [of superior 1st quality, of standard make] of all dia meters, confirming to grade D - 500 of IS:1786 [latest edition] including cutting, bending, transporting, placing in position & binding with suitable gauge soft annealed binding wire for all in-situ concrete works and all other miscellaneous RCC works, providing & placing spacer bars, cover blocks [cover blocks shall be cast in same grade of concrete & cured properly], preparation of base, providing; fixing & removing necessary staging / platform / ladder, collecting & disposing the generated waste, up to a lead of 2000 meters from the place of work & cleaning the work area, etc. complete all as per standard & manufacturers technical specification, drawing [if any] and as directed by engineer-in-charge at all locations & lifts / heights. | 13209 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.