Construction Of Rcc Foundation And Other Civil Works For Replacement Of 1 No. 132/33 Kv 20/25 Mva Transformer At 220 Kv Gss Kawai (baran)

Tendering Authority: Rajasthan Rajya Vidyut Prasaran Nigam Limited

India, Rajasthan, Baran

NTID

29322353

Last Date For Submission

10 Oct, 2022

Closing Date

10 Oct, 2022

BOQ Items Total Items : 17 | Total Qty : 7007
# Item Quantity Units
1 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils (B/1.8) 68.000 Cum
2 Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed:All kinds of soil (B/1.1) 706.000 Sqm
3 Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). (B/3.2.6) 19.000 Cum
4 Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix (B/4.1) 11.000 Cum
5 Labour charges for cutting, bending for fabrication and binding reinforcement (plain or top / ribbed steel) as per drawing and design for R.C.C. and R.B. work including cost of binding wire with all lead complete up to floor three level. (B/4.42) 800.000 Kg.
Tender InquiryInquiry