Tender for Power Transmission Corporation of Uttarakhand Limited - NTID 31341430
Power Transmission Corporation of Uttarakhand Limited
Haldwani, Uttarakhand, India
NTID 31341430
- Opening Date : Tue 18th April, 2023
- Closing Date : Mon 17th April, 2023
- ₹ 0.00
- NTID 31341430
Construction Of Random Rubble Stone Masonry Wall For Protection Of Tower No. 81 Of 132kv Sitarganj-kichha D/c Line Under Oandm Division, Ptcul, Sitarganj
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
125000.00 -
Document Cost
2360.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 7 | Total Qty : 1509.63
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation of protection wall near tower No. 81 of 132KV Sitarganj-Kichha D/C line at gola river size including dressing of sides and ramming of bottoms including getting out the excavated soil as directed including all leads and lifts. | 210 | Cumt. |
2 | Concreting required for bottom pad for protection wall in 1:4:8 ratio in 40mm stone ballast including cost of other material cement sand, stone etc. labour and T&P etc. | 90.56 | Cumt. |
3 | Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1Cement : 6 Coarse Sand : 12 Graded Stone aggregate 20mm nominal size) upto plinth level with : cement mortar 1:6 (1Cement : 6 Coarse sand) cost of all other material i.e. cement, sand, stone etc. labour and T&P, levelling etc. making of weep hole. | 474.38 | Cumt. |
4 | Providing and laying in position specific grade of cement concrete required for top and middle of protection wall in 1:3:6 (1Cement : 3 Coarse Sand : 6 Graded Stone aggregate 20 mm nominal size). | 47.44 | Cumt. |
5 | Supply and spreading of earth by earth work in excavation by mechanical means (Hydraulic excavator)/manual means over surface area in sides of foundation and plinth in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including all lead lift (land of earth supply to be arranged by the contractor at his own cost). | 86.25 | Cumt. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane