ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pump House 3 6, Purba Medinipur - Tender Details
Explore tender information for Construction Of Pump House 3 6 in Purba Medinipur, including eligibility, deadlines, and bid specifics.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Purba Medinipur, West Bengal, India
NTID 38863044
- Opening Date : Mon 27th January, 2025
- Closing Date : Fri 24th January, 2025
- ₹ 1538173.00
- NTID 38863044
Construction Of Pump House(3.6mx 3.0m), Boundary Wall, Proposed Rising Interconnection ,supply And Delivery Of Different Dia D.i. Specials Fittings With Allied Works Under Jjm At 4th Tw Site For Augmentation Of Kasbagola Water Supply Scheme Withi
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
30763.00 -
Document Cost
Refer Documents -
Estimated Cost
1538173.00
BOQ Items Total Items : 168 | Total Qty : 4919.133
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of 3.60 mtr x3.00mtr. Size Switch Room cum Chlorine Room (as per Departmental Design & Drawing) without sanitary & water supply arrangements including Plinth Protection at 4th Tube Well site for Kasbagola & its adjoining mouzas PWSS within Egra -I Block under Digha Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur. (Annexure-I) | ||
2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (Including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | ||
3 | (a) Depth of excavation not exceeding 1500 mm. | 16.83 | Cum |
4 | Earth work in filling in foundation trenches or plinth with good earth, In layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on basis of measurement of finished quantity of work). | ||
5 | a) With Earth obtained from excavation of foundation. | 11.22 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054