ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Pucca Path Wit, Mandi - Tender Details
Explore tender information for Construction Of Pucca Path Wit in Mandi, including eligibility, deadlines, and bid specifics.
Rural Development
Mandi, Himachal Pradesh, India
NTID 38938801
- Opening Date : Thu 23rd January, 2025
- Closing Date : Wed 22nd January, 2025
- ₹ 399974.00
- NTID 38938801
Construction Of Pucca Path With Inter Lock Tile With From Iron Railing From Forest Check Post Sakrah To Bbmb Road Gp Chambi Development Block Dhanotu
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 12 | Total Qty : 830.45
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in all kind of soil over areas upto any depth & in width as well as any sqm on plan including getting out and disposal of excavated earth all complete including carriage of materials with in all leads, lifts and other incidentals complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. | 11.25 | cum |
2 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, drains (Any width or square metre on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil as directed in all kinds of classification, of soils such as pick work, jumper work, blasting work saturated soils including chiseling or any other mixed variety of soils,dewatering and / or removal of slush and other incidentals within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases. | 57.45 | cum |
3 | Providing and laying, mechanically mixed and vibrated cement concrete 1:4:8 (one cement : four sand : eight graded crushed stone aggregate 40 mm (forty millimeter) nominal size) in foundation and plinth including curing complete excluding the cost of form work but including carriage of material with in all leads, lift, and other incidentals complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.72 | cum |
4 | Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc including carriage of materials with in all leads and lifts and other incidentials complete in all respect as per direction. | 10.00 | sqm |
5 | Random rubble masonry with hard stone of approved quailty in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement : six coarse sand : twelve graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including carriage of materials with in all leads, lifts and other incidentals, complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 6.88 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054