ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Public Toilet , Kishangarh - Tender Details
Explore tender information for Construction Of Public Toilet in Kishangarh, including eligibility, deadlines, and bid specifics.
GOVERNMENT OF HARYANA
Kishangarh, Rajasthan, India
NTID 38910287
- Opening Date : Wed 22nd January, 2025
- Closing Date : Tue 21st January, 2025
- ₹ 2023000.00
- NTID 38910287
Construction Of Public Toilet Near Shrimohanpura Balaji Temple
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
40460.00 -
Document Cost
500.00 -
Estimated Cost
2023000.00
BOQ Items Total Items : 51 | Total Qty : 5920.56
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | 19.44 | cum |
2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 40 mm nominal size) | 4.86 | cum |
3 | Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment | 29.70 | cum |
4 | Random rubble dry stone Kharanja (soling) under floor. | 9.90 | Cum |
5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto two stories, excluding the cost of centring, shuttering and finishing :1:1 :3 (1 cement : 1 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.59 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054