- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of COCHIN INTERNATIONAL AIRPORT LTD.
- >
NTID 39736240
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Pressure Fed F, Ernakulam - Tender Details
- Opening Date : Tue 15th April, 2025
- Closing Date : Fri 11th April, 2025
- ₹ 24780000.00
- NTID 39736240
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
500000.00 -
Document Cost
2500.00 -
Estimated Cost
24780000.00
BOQ Items Total Items : 49 | Total Qty : 47900
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 5km outside the periphery of the area cleared, as per specifications & directions of the Engineer-in-charge. | 3200.000 | SQM |
2 | Earth work in excavation for all kinds of soil by mechanical means (Hydraulic excavator/ manual means) over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 5km and lift upto 1.5m, as per specifications & directions of Engineer-in-charge. | 330.000 | CUM |
3 | Earth work in excavation for all kinds of soil by mechanical means (Hydraulic excavator/ manual means) over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 5km and lift 1.5m to 3m, as per specifications & directions of Engineer-in-charge. | 150.000 | CUM |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations, etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 3m, as directed by the Engineer-in-charge. | 260.000 | CUM |
5 | Supplying and filling in plinth under floors or trenches, in areas with crusher sand, including watering, ramming, consolidating and dressing, cost and conveyance of all materials, labour charges, lead, lift etc. complete at all levels as per specifications and as directed by the Engineer-in-charge. | 20.000 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054