ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Piau Indurwa P, Latehar - Tender Details
Explore tender information for Construction Of Piau Indurwa P in Latehar, including eligibility, deadlines, and bid specifics.
URBAN DEVELOPMENT DEPARTMENT
Latehar, Jharkhand, India
NTID 38907660
- Opening Date : Mon 27th January, 2025
- Closing Date : Sat 25th January, 2025
- ₹ 545900.00
- NTID 38907660
Construction Of Piau Indurwa Pond In Ward 4 Under Nagar Panchyat Latehar
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 35 | Total Qty : 3589.7355
# | Item | Quantity | Units |
---|---|---|---|
1 | Cost of Drilling 200 mm x 165 mm x 125 meter deep bore well in all kinds of soil and rock in Rural) area for Installation of pump set with Hydraulic DTH Ring machine, all complete including supplying all materials, tools, drilling, rig, Air Compressor and Equipments, as well as fuel, lubricants and cost of Transportation of Rig Machine and other Vehicle up to site from 0 mtr to 50 mtr | 50.000 | mtr |
2 | from 51 mtr to 125 mtr | 125.000 | mtr |
3 | Supplying all tools, tackles & lowering of 200 mm dia MS ERW casing pipe of 6 mm wall thickness including welding charges, cost of Pipe etc. including all taxes, VAT, Excise duty, Fright charges with inspection charges etc. as applicable, etc. all complete jobs. | 25.000 | p/MTR |
4 | Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. | 2.000 | hour |
5 | Supplying all materials, labours, tools & equipments for fitting & fixing 200 mm dia M.S.Cap over Casing Pipe including all taxes, VAT, Excise duty, Fright charges with inspection charges etc. as applicable, etc. all complite Jobs. | 1.000 | each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054