Tender for GOVERNMENT OF ORISSA - NTID 31341838
GOVERNMENT OF ORISSA
Deogarh, Odisha, India
NTID 31341838
- Opening Date : Mon 3rd April, 2023
- Closing Date : Fri 31st March, 2023
- ₹ 8848000.00
- NTID 31341838
Construction Of Phc Day Building At Reamal Under Reamal Block In The District Of Deogarh For The Year 2022-23.
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
88500.00 -
Document Cost
10000.00 -
Estimated Cost
8848000.00
BOQ Items Total Items : 184 | Total Qty : 16029.29
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. | 161.70 | Cum |
2 | Sand filling in foundation and plinth including cost of all material, labour, conveyance, loading and unloading, taxes, royalties, sundries, tools and plants etc. complete as per the driection of the Engineer in Charge. | 187.54 | Cum |
3 | Providing & laying plain cement concrete (1:3:6) using 4cm size metal etc. complete including all labour, materials & royality .etc. complete as per direction of EIC. | 59.50 | Cum |
4 | Providing lifting, hoisting and laying R.C.C. of M-20 Grade to base of columns and footing, columns, beams, plinth band, lintels, chajja, shaft, fins, roof slabs, balconies, stair cases, parapets, window sills, lofts, railing, jally, copping or in places as shown in the drawing for all floors with 20mm and down graded size black hard crusher broken ships of approved d finishing the exposed surfaces smooth (if required providing plaster with cement mortar (1:4) wherever necessary without any extra cost) including rigid smooth centering and shuttering, scafolding, watering (excluding reinforcement bars) and curing for required period including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge. (Ground Floor) Column base footing | 27.08 | Cum |
5 | (b) Column in S/S (G/F) | 8.65 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane