Department Of Water Resources
Bardez, Goa, India
NTID 38815119
- Opening Date : Wed 12th February, 2025
- Closing Date : Fri 7th February, 2025
- ₹ 53519849.00
- NTID 38815119
Construction Of Parra Minor Offtaking At Ch.37.200km Of Left Bank Main Canal Of The Tillari Irrigation Project In Parra Village Of Bardez Taluka.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1070397.00 -
Document Cost
25000.00 -
Estimated Cost
53519849.00
BOQ Items Total Items : 60 | Total Qty : 43054.04
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork in excavation in all types of strata comprising of any of the materials such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomorates, laterite rock, soft rock, fissured, shuttered decomposed rock hard granitic or basaltic and all such other materils to these specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted. Including chisselling, wedging but excluding blasting dressed to required shape etc. in all conditions such as saturated, dry, moist etc. complete including disposal of mterials in all leads & lifts etc.. complete as specified and directed. | 11626.00 | Cu.m. |
2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 69.00 | Cu.m. |
3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level. | 183.00 | Cu.m. |
4 | Centering & shuttering including Strutting, Propping & removal of forms for: i) Foundations, Footings, Bases for columns. | 1688.00 | Sq.m. |
5 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1 coarse sand:3 graded stone agg 20mm nominal size). a) All works upto plinth level. | 170.00 | Cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054