Inquiry NowConstruction Of Overhead Water, Patna - Tender Details
Explore tender information for Construction Of Overhead Water in Patna, including eligibility, deadlines, and bid specifics.
Department of Agricultural Research and Education
Patna, Bihar, India
NTID 39213793
- Opening Date : Tue 11th February, 2025
- Closing Date : Mon 10th February, 2025
- ₹ 0.00
- NTID 39213793
Construction Of Overhead Water Storage Tank In Farm Area At Icar-rcer, Patna
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
25000.00 -
Document Cost
1000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 31 | Total Qty : 4527.43
# | Item | Quantity | Units |
---|---|---|---|
1 | Sub Heading 1 | ||
2 | Surface dressing of ground include removle of Vegetation and inequalities not exceeding 15cm depth and disposal of rubbish, lead upto 50m and liftupto1.5m Total Area = 20 x25 =500=~46.46sqm. | 46.46 | sqm |
3 | Boring with hydraulic pilling rig with power unit,providing and installating cast- in situ single under reamed pilesof specified diameter and length below pile cap in M-25cement concrete, to carry a safe working load not less than specified,excluding the cost of steel reinforcement but including the costof boring with bentonite solution and the length of the pile to be embedded in pile cap etc.All complete.( length of pile for payment shall bemeasuredupto the bottom of pile cap). Dia of pile-0.3m, Depth=6.0m Total=6no.sx6m=36m | 36.00 | m |
4 | Providing and laying in position specified grade of reinforced concrete, excluding the cost of centring,shuttering, finishing,and reinforcement al l work upto plinth level1:1.5:3 (1 cement: 1.5 coarse sand(zone-III)derived from natural source :3 graded stone aggregate 20mm nominal size derived from natural source) Column=0.59cum,Base =1.59cum Tie beam=2.16cumTotal=4.34cum | 4.34 | cum |
5 | Reinforced cement concrete M20 work in wall columns etc up to floor five level excluding reinforcement ,shuttering ,all complete job Gr.floorcolumn=4,63cum Beam=2.11 Band=1.25 slab =5.56cum water tank slab=3.85cum R.C.C wall=5.06cum Total =22.46cum | 22.46 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054