Construction Of Open Stage At , Nicobar Island - Tender Details
Explore tender information for Construction Of Open Stage At in Nicobar Island, including eligibility, deadlines, and bid specifics.
Municipal Council
Nicobar Island, Andaman and Nicobar Islands, India
NTID 39442821
Opening Date : Fri 28th February, 2025
Closing Date : Fri 28th February, 2025
- ₹ 1426294.00
- NTID 39442821
Construction Of Open Stage At Krishna Nagar Ward No 11
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
28526.00 -
Document Cost
Refer Documents -
Estimated Cost
1426294.00
BOQ Items Total Items : 17 | Total Qty : 3327.74
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. a) All kinds of soil | 1.740 | Cum |
2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.305 | Cum |
3 | Centering and shuttering including strutting, propping etc. and removal of form for a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1.260 | Sqm |
4 | Centering and shuttering including strutting, propping etc. and removal of form for a) Columns, Pillars, Piers, Abutments, Posts and Struts | 77.760 | Sqm |
5 | Centering and shuttering including strutting, propping etc. and removal of form for a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 52.500 | Sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054