ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of One Office Bui, Subarnapur - Tender Details
Explore tender information for Construction Of One Office Bui in Subarnapur, including eligibility, deadlines, and bid specifics.
Department of Rural Development
Subarnapur, Odisha, India
NTID 38917596
- Opening Date : Sat 18th January, 2025
- Closing Date : Fri 17th January, 2025
- ₹ 1340000.00
- NTID 38917596
Construction Of One Office Building Of Pacs At Cherupali Under Dunguripali Block
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
13400.00 -
Document Cost
6000.00 -
Estimated Cost
1340000.00
BOQ Items Total Items : 27 | Total Qty : 2259.07
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation in hard soil including dressing and leveling the bed and depositing the soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth etc. complete in all respect & as per direction by the Engineer in charge. | 41.36 | Cum |
2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect & as per direction by the Engineer in charge. | 82.99 | Cum |
3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid etc. complete in all respect & as per direction by the Engineer in charge. | 13.69 | Cum |
4 | Fly Ash Brick Masonry in cement mortar (1:6)using Aly Ash bricks in foundationof 23cm x 12cm x 8cm having crushing strength not less than 75kg per sqcm with dimentional tolerance +/- 8% including watering, curing and cost, conveyance, royality of all materials & cost of laour charges etc. complete in all respect & as per direction by the Engineer in charge. In Foundation & Plinth | 24.55 | Cum |
5 | In Super-Structure | 25.01 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054