ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of New Storm Wate, Chennai - Tender Details
Explore tender information for Construction Of New Storm Wate in Chennai, including eligibility, deadlines, and bid specifics.
Chennai Metropolitan Development Authority (CMDA)
Chennai, Tamil Nadu, India
NTID 38817240
- Opening Date : Fri 31st January, 2025
- Closing Date : Thu 30th January, 2025
- ₹ 0.00
- NTID 38817240
Construction Of New Storm Water Drain In E Road Connecting Kaliamman Street Gcc Drain In Kwmc Koyambedu Chennai107
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
274000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 14 | Total Qty : 17560.1
# | Item | Quantity | Units |
---|---|---|---|
1 | Dismantling removing Reinforced Cement Concrete work and etc.,by mechanical means including stacking of steel bars and disposal of unserviceable material within 50m lead as per direction of Engineer in charge | 900.00 | Cu.m |
2 | Carting away surplus excavated earth available with in the campus is to be carted to a lead of within 3 KM from site. The rate shall include loading into the tipper/ lorry, transporting and unloading, leveling and the earth scooped by bulldozers grading etc.,complete with all respects complying with relevant standard specification, as directed by the Departmental Officers. | 4620.00 | Cu.m |
3 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | ||
4 | 0 to 2m depth. | 3720.00 | Cu.m |
5 | Supplying and Filling with M - sand in foundation and others sub structures for 100mm thick and well watered, rammed and consolidated by power compacter. The rate includes the cost of M sand, compacting with mechanical compactors labour charges for leveling, loading & Unloading and Transportation charges etc., complete and as per the standard specification. | 320.00 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054