ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Mukta Mancha A, Darjeeling - Tender Details
Explore tender information for Construction Of Mukta Mancha A in Darjeeling, including eligibility, deadlines, and bid specifics.
DISTRICT MAGISTRATE DARJEELING
Darjeeling, West Bengal, India
NTID 39438604
Opening Date : Mon 3rd March, 2025
Closing Date : Thu 27th February, 2025
- ₹ 437458.00
- NTID 39438604
Construction Of Mukta Mancha At Gedla Jote (raghuram) Under Hatighisa Gp, Mouza-raghuram, Aap Sl. No-40 (untied-2024-25) Id No-98211815,naxalbari Panchayat Samity Under 15 Th. Fc Fund
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
8749.00 -
Document Cost
Refer Documents -
Estimated Cost
437458.00
BOQ Items Total Items : 19 | Total Qty : 5242.0948
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | 18.040 | Cu.m |
2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work), (a) With earth obtained from excavation of foundation. | 3.610 | Cu.m |
3 | (ii) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | 41.250 | Cu.m |
4 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 62.150 | Sq.m |
5 | II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety, a) 1:3:6 proportion | 14.673 | Cu.m |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054