ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Model Health S, Seraikela-kharsawan - Tender Details
Explore tender information for Construction Of Model Health S in Seraikela-kharsawan, including eligibility, deadlines, and bid specifics.
BUILDING AND CONSTRUCTION AUTHORITY
Seraikela-kharsawan, Jharkhand, India
NTID 39422619
Opening Date : Fri 28th February, 2025
Closing Date : Thu 27th February, 2025
- ₹ 5548902.00
- NTID 39422619
Construction Of Model Health Sub Centre At Jamboro Under Kuchai Block In The District Of Seraikella For The Year 2024-2025
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
111000.00 -
Document Cost
10000.00 -
Estimated Cost
5548902.00
BOQ Items Total Items : 151 | Total Qty : 62929.23
# | Item | Quantity | Units |
---|---|---|---|
1 | EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in all kinds of Ordinary Soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | 103.46 | cum |
2 | Extra for earth work in hard soil as per specification & dirction of E/I. (Vide classification of soil item B) | 103.46 | cum |
3 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 63.77 | cum |
4 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 74.71 | cum |
5 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). | 30.88 | cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054