ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Market Complex, Kendujhar - Tender Details
Explore tender information for Construction Of Market Complex in Kendujhar, including eligibility, deadlines, and bid specifics.
Kanupur Irrigation Project
Kendujhar, Odisha, India
NTID 39423439
Opening Date : Mon 3rd March, 2025
Closing Date : Sat 1st March, 2025
- ₹ 4119151.00
- NTID 39423439
Construction Of Market Complex Along With Electrification At Basudevpur Phase-ii R And R Colony For The Dps Of Village Basudevpur Rugudi And Dhobakuchuda Of Kip
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
42000.00 -
Document Cost
6000.00 -
Estimated Cost
4119151.00
BOQ Items Total Items : 41 | Total Qty : 4990.01
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in hard soil or gravelly soil for foundation within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | 152.950 | Cum |
2 | Filling foundation and plinth with excavated material with well compacted etc. complete as per the direction of the Engineer-in-charge. | 50.980 | Cum |
3 | Filling foundation & plinth with coarse sand watering ramming with cost,coveyance ,royalty and Labour charges etc complete and as per the Direction of the Engineer-in-charge. | 125.790 | Cum |
4 | Cement concrete (1:3:6) with 40mm size hard granite metal with watering and curing including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete and as per the direction of the Engineer-in-Charge. | 41.640 | Cum |
5 | Reinforced Cement concrete (M-20) using 20mm down graded hard black granite CB chips with watering and curing excluding shuttering but including cost,conveyance, royalty of all materials, labour, T& P etc complete. | 77.340 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054