Tender for Highways Department - NTID 31413296
Highways Department
Dindigul, Tamil Nadu, India
NTID 31413296
- Opening Date : Wed 19th April, 2023
- Closing Date : Mon 17th April, 2023
- ₹ 94491505.00
- NTID 31413296
Construction Of Limited Use Subway Lus Lc No 2 For The Main Work Construction Of Rob At Km 1 5 2 7 Of Dindigul Manakattur Road In Lieu Of The Existing Lc No.2 At Railway Km 1 10 11 In Between Dindigul And Akkaraipatti Railway Stations Lc No 308
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
483000.00 -
Document Cost
Refer Documents -
Estimated Cost
94491505.00
BOQ Items Total Items : 88 | Total Qty : 53902.4
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank including existing Road Surface with all leads and lifts as per SS20B, including cost of all labour, equipments sheeting, shoring, and bracing and shells and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for EXCAVATION OF FOUNDATION OF RAFT SLAB, RETAINING WALLS as per section 300 of MoRTH specification (5th revision) upto 2m depth | 4630.00 | Cum |
2 | Earthwork excavation in SDR not requiring blasting and depositing on bank including existing Road Surface with all leads and lifts as per SS20B, including cost of all labour, equipments sheeting, shoring, and bracing and shells and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for EXCAVATION OF FOUNDATION OF RAFT SLAB, RETAINING WALLS as per section 300 of MoRTH specification (5th revision) from 2m to 3m depth | 1860.00 | Cum |
3 | from 3m to 4m depth | 1500.00 | Cum |
4 | from 4m to 5m depth | 1050.00 | Cum |
5 | from 5m to 6m depth | 640.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane