Inquiry NowConstruction Of Labour Shed Si, Akole - Tender Details
Explore tender information for Construction Of Labour Shed Si in Akole, including eligibility, deadlines, and bid specifics.
FOREST DEPARTMENT
Akole, Maharashtra, India
NTID 38839791
- Opening Date : Wed 22nd January, 2025
- Closing Date : Mon 20th January, 2025
- ₹ 1392470.00
- NTID 38839791
Construction Of Labour Shed Single Unit With Chain Link Fencing Compound At Devthan In Gut No 257 1 In Akole Egs Range Of Ahilyanagar Division
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
13925.00 -
Document Cost
600.00 -
Estimated Cost
1392470.00
BOQ Items Total Items : 66 | Total Qty : 1612.174
# | Item | Quantity | Units |
---|---|---|---|
1 | Item No. 1 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, (Details As per Estimate) | 14.6180 | Cum |
2 | Item No. 2 Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering. preparing the bed (Details As per Estimate) | 7.3080 | Cum |
3 | Item No. 3 Excavation for foundation in hard murum and boulders including removingthe excavated maerial up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering preparing. (Details As per Estimate) | 1.2180 | Cum |
4 | Item No. 4 Excavation for foundation in soft rock and old cement or linme masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed including dewatering (Details As per Estimate) | 0.7300 | Cum |
5 | Item No. 5 Excavation for foundation in Hard rock by chiselling, wedging, line drilling etc including trimming and levellingthe bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as (Details As per Estimate) | 0.4900 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054