Tender for Department of Rural Development - NTID 29270308
Department of Rural Development
Bhanjanagar, Odisha, India
NTID 29270308
- Opening Date : Tue 11th October, 2022
- Closing Date : Mon 10th October, 2022
- ₹ 0.00
- NTID 29270308
Construction Of Jmfc Court Building At Jagannathprasad In The District Of Ganjam
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
10000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 266 | Total Qty : 31851.639
# | Item | Quantity | Units |
---|---|---|---|
1 | Construction of embankment with approved material obtained from borrow pits transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MoSRT&H specifications for Road and Bridge works (4th Revision) with cost of all labour, T&P and with cess, royality and as per direction of Engineer-in-charge. (Payment of earthwork will be made compacted level section) only | 2283.89 | One Cum |
2 | Earth work in excavation of foundation in all kinds of soil with 50m initial lead and 1.50m initial lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth with all leads and lifts including cost of all labour, cess and T&P and dewatering if required for the work etc. Complete as directed by the Engineer-in charge | 396.20 | One Cum |
3 | Supplying & filling good clean river sand inside the foundation / plinth of approved area including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty, cess & taxes of all materials & cost of all labour & T&P required for the work complete (measurement will be taken for compacted section) as per direction of Engineer-in-Charge. | 742.00 | One Cum |
4 | Filling foundation / plinth with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming, watering, complete with all leads & lifts with cost of all labour & T&P required for the work complete as per direction of Engineer-in-Charge | 264.13 | One Cum |
5 | Cement Concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black broken granite stone metal (C.B) of approved quality and from approved quarry including hosting lowering and laying concrete in layers not exceeding 15cm thick to the required level ramming, watering and curing etc. complete including cost and conveyance of all materials with all taxes and royalty and all labour, cess with T&P required for the work etc. complete including dewatering if required as per direction of the Engineer-in-Charge. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane