ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Jhora At Taman, Darjeeling - Tender Details
Explore tender information for Construction Of Jhora At Taman in Darjeeling, including eligibility, deadlines, and bid specifics.
GORKHALAND TERRITORIAL ADMINISTRATION
Darjeeling, West Bengal, India
NTID 39437363
Opening Date : Mon 3rd March, 2025
Closing Date : Thu 27th February, 2025
- ₹ 320547.00
- NTID 39437363
Construction Of Jhora At Tamang Tole, Ward No.- Iii, Ps- 25, Dooteria Kalej Valley Within Jorebunglow Sukhia Pokhari Panchayat Samity
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6411.00 -
Document Cost
Refer Documents -
Estimated Cost
320547.00
BOQ Items Total Items : 6 | Total Qty : 415.65
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | 59.16 | Cum |
2 | Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any | 46.04 | Cum |
3 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | 143.13 | Sqm |
4 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].(i) with 1:6 cement mortar.(b) 20 mm. thick plaster. | 83.16 | Sqm |
5 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. | 83.16 | Sqm |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054