Tender for Haryana Government - NTID 29293826
Haryana Government
Palwal, Haryana, India
NTID 29293826
- Opening Date : Wed 5th October, 2022
- Closing Date : Tue 4th October, 2022
- ₹ 688259.00
- NTID 29293826
Construction Of Ipb Road And Drain From H/o Sukha Tractor, Nirotam Fouji To Naresh To Rohit In Ward No 06 In Mc Palwal
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 13 | Total Qty : 1824.29
# | Item | Quantity | Units |
---|---|---|---|
1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. Through Rate | 8.380 | cum |
2 | [11.8.2]12 mm cement plaster of mix : 2. 1:6 (1 cement: 6 coarse sand) Through Rate | 68.580 | sqm |
3 | [17.22.2]Water Bound Macadam Gr I 2. Water Bound Macadam Grading I with screening Type A Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications Through Rate | 85.340 | cum |
4 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications Through Rate | 8.000 | Sqm |
5 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. Through RatMORTandH specifications 1. Grading I material | 622.860 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane