Tender for Rajya Krishi Utpadam Mandi Parishad - NTID 30544537
Rajya Krishi Utpadam Mandi Parishad
Charkhari, Uttar Pradesh, India
NTID 30544537
- Opening Date : Thu 2nd February, 2023
- Closing Date : Wed 1st February, 2023
- ₹ 5182000.00
- NTID 30544537
Construction Of Hot Path Ramupura Under Mandi Samiti Charkhari
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
520000.00 -
Document Cost
9200.00 -
Estimated Cost
5182000.00
BOQ Items Total Items : 26 | Total Qty : 4917.93
# | Item | Quantity | Units |
---|---|---|---|
1 | Boring and costing of 30 cm dia piles of Single under reamed of 75 cm. dia bulb and 3.50 m deep below ground level consisting 4 nos. 12 m.m dia main bar and 6mm 25 cm.C/C ring filled with c.c. in 4:2:1 in 2 cm. guage stone grit coarse sand and cement in supply of all materials labour T&p etc. required for proper completion of work . | 84.00 | Rm. |
2 | Boring and costing of 20 cm dia pilas of Single under veamed of 50 cm. dia bulb and 3.50 m deep below ground level consisting 4 nos. 10m.m dia main bar and 6mm 25 cm.C/C ring filled with c.c. in 4:2:1 in 2 cm. gauge stone grit coarse sand and cement in supply of all materials labour T&p etc. required for proper completion of work . | 337.31 | Rm. |
3 | Excavation in foundation in black cotton soil including lift up to 1.5 M and lead up to 50 M. and including filling, watering and ramming of the excavated earth into the trenches or into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 50 M.from the foundation trenches(S.I.No. 257) | 53.93 | Cum |
4 | Cement concrete with 4 cm gauge stone ballast, coarse sand of cement in proportion of 1:6:12 in foundation & under floors, including supply of all materials, labour & T&P etc. required for proper completion of the work(S.I.No. 281) | 197.20 | Cum |
5 | Reinforced cement concrete with cement, approved coarse sand and 2 cm (3/4") gauge graded approved stone grit in the proportion of 1:2:4 in raft foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG. G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials labour and tools and plants etc. required for proper completion of the work (SI 287) | 29.53 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month