Tender for Highways Department - NTID 29988895
Highways Department
Mettupalayam, Tamil Nadu, India
NTID 29988895
- Opening Date : Wed 4th January, 2023
- Closing Date : Mon 2nd January, 2023
- ₹ 57000000.00
- NTID 29988895
Construction Of High Level Bridge In Lieu Of Existing Old Narrow Bridge Across Lower Bhavani Canal At Km 0 6 Of Kurumandur Kadathur Road
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
295000.00 -
Document Cost
Refer Documents -
Estimated Cost
57000000.00
BOQ Items Total Items : 74 | Total Qty : 22656.614
# | Item | Quantity | Units |
---|---|---|---|
1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank, with all leads and lifts as per SS20B, with all leads and lifts and all other incidental charges such as bailing out water,shoring,strutting,walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification FOR DRESSING THE BED UPTO SILL LEVEL. | 338.00 | Cum |
2 | Earthwork excavation in all classes of soil and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, WINGS AND PIERS as per section 300 of MORT&H Specifications (Fifth Revision-2013). | 1325.00 | Cum |
3 | Earth work excavation in rock not requiring blasting and depositing on bank with all leads and lifts including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, RETURNS AND PIERS. | 1790.00 | Cum |
4 | Vibrated Cement Concrete of Grade M10 (Nominal Mix 1:3:6), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS as per section 2100 of MORT&H Specifications (Fifth Revision-2013). | 58.00 | Cum |
5 | Vibrated Cement Concrete of grade M20 (Nominal mix) using 40 mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENT, RETURN WALLS AND PIERS as per Cl. 18.5 of IRC:112-2011 and as per section 1500,1700 & 2100 of MORT&H Specifications (Fifth Revision - 2013). | 1068.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane