- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Ministry of Road Trasnsport and Highways
- >
NTID 39808320
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of High Level Bri, Chennai - Tender Details
Ministry of Road Trasnsport and Highways
Chennai, Tamil Nadu, India
NTID 39808320
- Opening Date : Fri 25th April, 2025
- Closing Date : Thu 24th April, 2025
- ₹ 74167000.00
- NTID 39808320
Tender Description
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
382000.00 -
Document Cost
17700.00 -
Estimated Cost
74167000.00
BOQ Items Total Items : 94 | Total Qty : 646748.56
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work excavation in all classes of soils/ soft disintegrated rock and soft rock not requiring blasting and depositing on bank,with all leads and lifts as per SS 20B, including all other incidental charges such as bailing out water,shoring, strutting, walling & forming protective bunds wherever necessary ,etc., complete, as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL | 504.00 | Cum |
2 | Earth work excavation in all classes of soils except hard rock, including soft disintegrated rock/ weathered rock not requiring blasting and depositing on bank, with all leads and lifts as per SS 20B, including all other incidental charges such as bailing out water, shoring, strutting, walling & forming protective bunds wherever necessary etc., complete as per relevant standard specifation, FOR FOUNDATION UNDER ABUTMENTS AND PIERS as per Section 300 of MORT&H specifications (V revision) (including 600mm from the face of foundation for extra working space as per IS: 1200 (Part 1) - 1992 Cl:4.2.5.1) | 1489.00 | Cum |
3 | Compacted Cement concrete of grade M15 (Nominal Mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges etc., complete as per section 2100 of MORT&H specification (V Revision) for LEVELLING COURSE below foundation of Abutments & Piers. | 35.00 | Cum |
4 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, and hire charges for Tools and Plants including all other incidental charges, etc.,complete as per section 1500, 1700 & 2100 of MORT&H specification (V Revision) for FOOTING OF PIERS, ABUTMENTS AND RETURNS. | 437.00 | Cum |
5 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, as per section 1500, 1700 & 2200 of MORT&H specification (V Revision) for SUB STRUCTURE - ABUTMENT and RETURNS. | 178.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054