ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Ground Floor F, CHIRANG - Tender Details
Explore tender information for Construction Of Ground Floor F in CHIRANG, including eligibility, deadlines, and bid specifics.
Bodoland Territorial Council
CHIRANG, Assam, India
NTID 39000395
- Opening Date : Thu 6th February, 2025
- Closing Date : Thu 6th February, 2025
- ₹ 4999552.00
- NTID 39000395
Construction Of Ground Floor For The Proposed G Plus 1 College Building At Dakshin Bijni College, Ananda Bazar In Baksa District. Tn_52_5
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
100000.00 -
Document Cost
1000.00 -
Estimated Cost
4999552.00
BOQ Items Total Items : 22 | Total Qty : 19273.98
# | Item | Quantity | Units |
---|---|---|---|
1 | A. Civil Work Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 256.370 | Cum |
2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 249.110 | Cum |
3 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 156.000 | Sqm |
4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 11.740 | Cum |
5 | Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 114.620 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054