ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Four Lane Rail, Dabhoi - Tender Details
Explore tender information for Construction Of Four Lane Rail in Dabhoi, including eligibility, deadlines, and bid specifics.
ROAD AND BUILDING DEPARTMENT
Dabhoi, Gujarat, India
NTID 38743012
- Opening Date : Refer Documents
- Closing Date : Fri 17th January, 2025
- ₹ 591093919.36
- NTID 38743012
Construction Of Four Lane Railway Over Bridge In Lieu Of L.c. No. 65a Between Block Station Dabhoi-chhotaudepur At Railway Km. 68/8 To 69/0 On Dabhoi-bodeli Road (s.h.-11) Dist. Chhotaudepur
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5911000.00 -
Document Cost
18000.00 -
Estimated Cost
591093919.36
BOQ Items Total Items : 50 | Total Qty : 811065.8
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing and grubbing road land including uprooting rank vegetation grass bushes, shrubs, sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials (C) By mechanical means in area of light jungle. | 2.900 | Hect. |
2 | Demarkation of road alignment including marking out road line by providing and fixing wooden pegs or steel rod of required size at every 25 M to 50 M. including excavating trenches in both sides of 0.30 m. x 0.30M. including supplying of labours and all materials for every work etc. complete. | 2.700 | Km. |
3 | Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring, strutting dewatering as necessary and disposing of the excavated stuff as directed. (A) Depth upto 3.0 mt. | 19542.800 | Cum |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering. | 767.000 | Cum |
5 | Empty boring through all sorts of strata for providing 1.20 mt. dia. R.C.C. bored piles to required depth including providing necessary casing pipe with all plants and equipment's as required complete. | 2346.000 | Rmt. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054