Inquiry NowConstruction Of First Floor Of, Solan - Tender Details
Explore tender information for Construction Of First Floor Of in Solan, including eligibility, deadlines, and bid specifics.
Dr. Yashwant Singh Parmar University of Horticulture and Forestry
Solan, Himachal Pradesh, India
NTID 38869502
- Opening Date : Wed 29th January, 2025
- Closing Date : Wed 29th January, 2025
- ₹ 17864013.00
- NTID 38869502
Construction Of First Floor Of Pg Block At College Of Horticulture And Forestry Neri Hamirpur Sh Building Portion Water Supply And Sanitary Installation
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
358000.00 -
Document Cost
10000.00 -
Estimated Cost
17864013.00
BOQ Items Total Items : 92 | Total Qty : 78060.53
# | Item | Quantity | Units |
---|---|---|---|
1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas in all width and depth on plan) including getting out and disposal of excavated earth all leads, lifts and carriage of material as directed by the Engineer-in-charge .a). Ordinary rock | 13.89 | Cubic Metre |
2 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Above plinth level up to all floor level with 1:1:2 (one cement: one sand: two stone aggregate 20 mm (Twenty milimetre) nominal size) excluding cost of shuttering, finishing and reinforcement etc. Complete in all respect as per satisfaction of Engineer-in-charge. | 95.04 | Cubic Metre |
3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to all floor level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1:2 (one cement : one sand : two graded stone aggregate 20 mm(twenty milimetre) nominal size) etc. complete in all respect as per satisfaction of Engineer-in-Charge. | 368.88 | Cubic Metre |
4 | Centering and shuttering including strutting, propping etc. and removal of form for etc. complete in all respect as per satisfaction of Engineer-in-charge. | ||
5 | a). Suspended floors, roofs, landings, balconies and access platform. | 1582.30 | Square Metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054