ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now
Construction Of Engineering Ha, Indore - Tender Details
Explore tender information for Construction Of Engineering Ha in Indore, including eligibility, deadlines, and bid specifics.
Raja Ramanna Centre for Advanced Technology Indore
Indore, Madhya Pradesh, India
NTID 39373856
Opening Date : Tue 18th March, 2025
Closing Date : Thu 13th March, 2025
- ₹ 48000000.00
- NTID 39373856
Construction Of Engineering Hall Building For Uhv System Including Internal Ph Works And External Service Connections At Rrcat, Indore
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
960000.00 -
Document Cost
Refer Documents -
Estimated Cost
48000000.00
BOQ Items Total Items : 135 | Total Qty : 22773.25
# | Item | Quantity | Units |
---|---|---|---|
1 | Imp. Note - 1. The bidder must possess valid EPF & ESIC registration. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for EPF & ESIC deposit shall not be made. 2. The payment of wages to labourers should be made through bank. 3. The bidder must possess sufficient manpower & other resources (as detailed in SGF ) required for the timely completion of work. 4. It is also proposed to mention that running bill shall be processed as per clause 7 of SGF subject to minimum amount of Rs.25.00 lakhs. | ||
2 | Earthwork excavation over areas in all soils except soft and hard rock by mechanical means (hydraulic Excavator) and disposing off & levelling the soil within a distance of 50 metre. | 1000.00 | Cum |
3 | Earthwork excavation in foundations in all soils other than soft and hard rock by mechanical means (hydraulic Excavator) upto a depth specified below, including shoring and dewatering, if necessary and refilling around foundations and in plinth with selected excavated earth, in layers not exceeding 250mm thick, consolidating etc., and disposing surplus earth within a distance of 50 metre lead. (Depth of excavation shall be measured from the existing average ground level all complete as per drawing, specification and as directed by Engineer in-charge. | ||
4 | 0.00 metre to 1.50 metre below average G.L | 450.00 | Cum |
5 | 1.50 metre to 3.0 metre below average G.L | 350.00 | Cum |

Purchase Access To Download Selected Documents
₹ 200
Select this Plan

For a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054