ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowConstruction Of Dr Babasaheb , Nagpur - Tender Details
Explore tender information for Construction Of Dr Babasaheb in Nagpur, including eligibility, deadlines, and bid specifics.
Nagpur Metropolitan Region Development Authority
Nagpur, Maharashtra, India
NTID 38757126
- Opening Date : Tue 28th January, 2025
- Closing Date : Mon 27th January, 2025
- ₹ 4020843373.00
- NTID 38757126
Construction Of Dr. Babasaheb Ambedkar Super Speciality Hospital And Post Graduate Institute For Medical Sciences At Kh. No. 101, 102 And 103, Mz. - Indora, Nagpur.
Documents
Get Complete Tender Details Now – Download the Document!
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20105000.00 -
Document Cost
50000.00 -
Estimated Cost
4020843373.00
BOQ Items Total Items : 792 | Total Qty : 1195037.26
# | Item | Quantity | Units |
---|---|---|---|
1 | A. EARTH WORK Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Hospital, MLCP & Service Block | 29910.00 | Cum |
2 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 20419.00 | Cum |
3 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By MechanicalMeans | 5070.00 | Cum |
4 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 3.0m To 4.5 m.) By MechanicalMeans | 17745.00 | Cum |
5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 4.5m To 6.0 m.) By MechanicalMeans | 7605.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054